Being built
The city has allowed these. Work may not have started.
New house
24 Arrow Rd
24 Arrow Rd · Humber River-Black Creek
Approved 12 Jun 2026
Conditional Permit - Drain - Proposed two-phase expansion to the exiting industrial facility with an approximate gross floor area of 5700 sqm. Scope includes construction of a new addition with loading docks and doors,…
Industrial
720 Arrow Rd
720 Arrow Rd · Humber River-Black Creek
Approved 3 Mar 2026
REVISION - due to minor changes that have come up due to the sales trailer specificationsProposed to install a sales trailer on a vacant industrial site, as a permanent structure.
Coming down
The city has allowed these buildings to come down. They may still be standing.
Demolition
24 Arrow Rd
24 Arrow Rd · Humber River-Black Creek
Approved 27 Feb 2026
Demolition of one-storey steel-clad workshop located at 30 Arrow Road and one-storey brick building located at 24 Arrow Road. Demolition includes removal of building envelope, structural framing, slabs, foundations, and…
Plans you can answer
Someone has asked the city for a change. Nothing here is a decision.
Site plan
24 Arrow Rd
24 Arrow Rd · Humber River-Black Creek
Asked 14 Apr 2025
Phased Site Plan Control application to construct a two-storey warehouse addition to the existing industrial building. Phase 1 will have a GFA of 2,410m² and Phase 2 will have a GFA of 3,294m². The total GFA, including the existing industrial building, will be 10,780m².
How to respond
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Alexandra Mangat · [email protected].
Site plan
720 Arrow Rd
720 Arrow Rd · Humber River-Black Creek
Asked 7 Feb 2025
Proposed low-rise multi-tenanted industrial building.
How to respond
Site plan approval is usually a staff decision. A written comment to the city planner is the step on this file. It is not a community-council deputation.
Write Berardo Mascioli · [email protected].